ACM - THE ACADEMY OF CONTEMPORARY MUSIC

MUSIC SCHOOL DESIGN AND FIT OUT

MUSIC SCHOOL DESIGN AND FIT OUT

A complete acoustic design and fit-out of the Academy of Contemporary Music (ACM) Artist Development Centre in Guildford, Surrey UK.

The brief was complicated by being split over three floors; a basement level, where we constructed a suite of music practice rooms and then floors 2 and 3, where we created individual music studio and performance areas.

The complication came with Tesco Metro occupying floor 1, the ground floor, sandwiched between the areas where the music school was to operate.

This meant that we had to create an acoustically sound-proofed environment, with zero sound transfer between floors.

Client: ACM - The Academy of Contemporary Music

Size: 8000 sq. ft.

Project Duration: 14 weeks

Location: Guildford, UK

Scope of project: Creative & Bespoke Interior Design, Specialist Acoustic Refurbishment, Commercial Refurbishment, Partitions & Glazing, Branding & Decoration, Specialist Lighting, AV Suite Installation